The non-renewable resources of energy are declining rapidly with the increasing demand for energy as the population grows around the world. More and more resources, gas, light, electricity, and so on are needed for this growing demand for energy and the survival of our humankind. As these natural resources get depleted, sunny countries, like Australia, have turned towards green, clean energy – the sun, being the biggest energy source here. 

Solar panels absorb energy from the mighty sun and convert them into electricity to be used efficiently. GreenLight is one such company, in Australia, that facilitates this process. The GreenLight Installation process is pretty convenient and eco-friendly for the masses. 

GreenLight Energy Solutions understands that every family and company is unique. They provide a custom solution depending on your usage, lifestyle, needs, and budget. Also, they give a formal quotation that includes all system information such as the number of panels, inverter, and pricing. They will complete your grid connect permissions after you approve.

Solar Installation Process in Australia

Conduit from the building or house that will gain the power to the location where the solar panel array will be installed should be situated. Build a structure using concrete pillars and 4x4s to support the solar array after the conduit is in place.

Professionals like GreenLight are ready to begin once the platform has been completed. The team employs eight 24-volt 110-watt Photovoltaic panels which have already been pre-fastened once again to make the solar array. 

The team then attaches the panels to the structure. At the attachment places, angle brackets have been utilized, and the front feet were also installed first. Before becoming fixed into position, the feet were squared as well as centred.

Important: Rear Legs Should Be Secured

As for you, you can determine the right angle for the array using climatic data, then hoist and secure those rear legs.

  1. Connect the solar modules with a junction connection or a fuse combiner box by wiring them all together. Before being linked to that same fuse box situated on the platform and linked to subterranean conduit output cords, the modules must be stripped as well as wired in pairings.
Remember to follow all necessary safety precautions while undertaking each and every electrical work. Complex electrical work is generally better left to specialists due to the hazard involved.
  1. The stripped wires should be correctly connected throughout the terminal box. The positive terminal is linked to the red wires, while the negative terminal is attached to the black wires for this case. The wires are administered once they have been joined. 
  1. After you’ve erected, oriented, and connected the solar array, it’s time to connect the outer wiring to the inside control panels. Your solar breaker would be linked toward a circuit breaker disconnection first. Then energy will be transferred out from the disconnect toward a charge controller, finally to a battery system, where it will be preserved.
  1. When necessary, electricity travels again from batteries towards the circuit breaker disconnection and then to a power inverter (this will change the power from DC to AC). Finally, this transformed electricity will go into an electric board, where it will deliver electricity to the residence.
In this case, the solar system is however linked to a backup gas generator with a good pump. To deal with all of the above, the solar installer suggests installing 2 240-volt inverters to the rightmost breakers. To work, every component, along with the new converters, should be linked to the household’s main electrical system.
  1. Through the subterranean conduit, run the electrical wire from the solar array to the home. Link the cables onto nylon rope to make threading easier, then draw via the conduit towards the inverter panels.
  1. Connect these cables to the fuse combiner box at the solar array’s foundation. First, the green wires are attached to the grounding strip. The red wires link to the PV output positive terminal box, while the black wires link to the PV output negative terminal box.
  1. Finish the external work by inserting a grounding rod near the array further into the soil. Consider leaving the long rod approximately 6″ above the surface. Connect the rod to the fuse box as well as the solar panels to just the fuse box with copper grounded wire.
  1. After you’ve run the grounding wire, make the necessary electrical connections inside. Plug the array’s cords toward the inverter panel disconnection. The red wire gets connected to the positive terminal once more, the green grounding wire to that same grounding terminal, as well as the black wire towards the negative terminal. 

Lastly, the battery bank is installed as in loft space well above modern control panels by the team. To begin, run the conduit via the ceiling to just the inverter panel. After that, connect two heavy-duty battery cables towards the panel’s disconnection. The wires’ other ends will be attached to the battery pack.

Solar Panel Installation Procedure: GreenLight’s Contribution

GreenLight Clean Energy Council Certified Installation Team helps set up your installation while causing the least amount of inconvenience to your day. GreenLight transmits all papers to your energy retailer, allowing you to relax and get the rewards from your solar system. There are some other things you should notice as well. 

Most people want to install solar panels on the roof. First of all, you have to follow where the sunlight falls most of the time. Selecting the apex place on the roof will be suitable for the user because the board can easily absorb the sunlight. 

Set up the board: 

Before installing the board, you should follow some factors.

  • Where you want to set the board.
  • Is there enough sunlight most of the time?
  • It would not be wise to select a place where you can’t easily reach for washing or other purposes. 
  • Don’t select any tinny place for installing.

What can be the appropriate angle for the Panel Board installation?

Mainly 18 to 36 Degrees will be able to gather more energy than any other. So you should set your panels at an appropriate angle to get a greater portion.

Ensuring stability :

Stability is an essential factor for solar panel installation. Only that time your panel will be vital when tightening, Bolts, Nuts are fitted duly. So when you fix it, you should notice it, which is stable on your Solar Panel.

Conclusion

GreenLight’s monitoring system can identify if your system is really not operating effectively and therefore will notify us and you if maintenance is required. If you have any more queries, do not hesitate to contact us!